Al and Woody from The Skid Factory are back with a new episode on the Bedford Van project. The goal is install a turbocharged 4.0 L Barra inline-six and ZF six-speed transmission into the van. In this episode the team makes fuel and oil lines and explains how to work with AN fittings.
Source: MCMTV2
